Type
Commercial
Location
Downtown Los Angeles, CA
Year
2024
Area
3,200 sq ft
Materials
3,500 board feet of mixed reclaimed hardwoods
Timeline
10 weeks
Budget Range
$180,000 - $220,000
Wood Species Used
- Reclaimed Barn Wood (walls)
- Reclaimed Maple (flooring)
- Black Walnut (bar + communal table)
Finishes Applied
- Matte clear coat on barn wood
- Oil-based polyurethane on maple floors
- Hand-rubbed oil on walnut surfaces
Project Story
A chef-driven concept in downtown Los Angeles wanted an interior that felt original to its century-old brick building. Only authentic reclaimed materials would deliver the patina they envisioned.
We supplied weathered barn wood from a Santa Ynez dairy barn for dramatic accent walls, wire-brushed and sealed with a matte clear coat to preserve its silvered surface.
Reclaimed maple from a decommissioned Glendale gym floor became the main dining and bar flooring, chosen for hardness and traffic durability.
A 16-foot black walnut slab was crafted into the communal table, paired with a 22-foot walnut bar top and industrial oak shelving for spirits display.
The build-out used over 3,500 board feet of reclaimed hardwoods, diverting the equivalent of 14 mature trees and earning press in local design publications.
Before & After
BBefore
The raw space had concrete floors, exposed brick, and outdated mechanicals. No finishes existed, and the owners wanted a warm, time-worn look without faux distressing.
AAfter
Today the restaurant features warm barn wood walls, gleaming reclaimed maple floors, and statement walnut slabs that make the space feel storied and welcoming from day one.
Material Specifications
Accent Walls
Reclaimed barn wood, gray patina, wire-brushed, matte clear coat.
Flooring
Reclaimed maple gym planks, sanded and finished with oil-based polyurethane.
Bar & Table
Black walnut slabs, hand-rubbed oil finish, live-edge communal table.
Project Timeline
Material Selection
1 weekOwners hand-selected barn wood and walnut slabs at our yard.
Floor Milling
2 weeksMaple gym planks denailed, planed, and milled to T&G for commercial install.
Wall & Bar Fabrication
3 weeksBarn wood pre-finished; walnut slabs flattened and finished; bar shelving built.
Installation
3 weeksCoordinated flooring, wall cladding, and bar install around MEP trades.
Finishing Touches
1 weekFinal coats, punch list, and acoustics adjustments with fabric panels.
Challenges & Solutions
Challenge
Tight downtown loading with alley-only access.
Solution
Used small flatbeds and staged materials nightly to keep the alley clear by morning.
Challenge
Need for durable finish against heavy restaurant traffic.
Solution
Specified commercial-grade oil poly on maple and added extra top coat in high-traffic lanes.
Challenge
Maintaining authentic patina without splinters.
Solution
Wire-brushed and sealed barn wood, keeping color while making surfaces guest-safe.
“Guests assume the space has been here forever. The reclaimed wood gives it soul that new materials just cannot match.”
Chef Lena M.
Owner / Executive Chef